Duell Plumbing & Heating replaced a failing 1950s asbestos sewer lateral in Clifton Park after a camera inspection identified severe pipe bellies. The 13-hour excavation spanned 70 to 80 feet, installing modern SDR pipe, exterior cleanouts, and a direct tie-in to the municipal manhole while coordinating with driveway paving.